Tumut ponds project of snowy scheme
Snowy Mountains scheme is scheduled for completion before end of 1954; under construction are: 21-ft diam concrete lined Eucumbene-Tumut tunnel, 13.8 mi long; Tumut pond arched dam, 290 ft high; spillway controlled by two 47×30 ft radial gates; underground power station, 250 ft long, 59 ft wide, and 110 ft high, will have ultimate capacity of 320,000 kw. See also Engineering Index 1953 p 507.
Tumut ponds project of snowy scheme
Snowy Mountains scheme is scheduled for completion before end of 1954; under construction are: 21-ft diam concrete lined Eucumbene-Tumut tunnel, 13.8 mi long; Tumut pond arched dam, 290 ft high; spillway controlled by two 47×30 ft radial gates; underground power station, 250 ft long, 59 ft wide, and 110 ft high, will have ultimate capacity of 320,000 kw. See also Engineering Index 1953 p 507.
Tumut ponds project of snowy scheme
Commonwealth Engr
1954
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1960
|Tumut valley power and irrigation scheme
Engineering Index Backfile | 1949
Driving Eucumbene-Tumut tunnel
Engineering Index Backfile | 1957
Tumut 2 underground power plant
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1958
|