A platform for research: civil engineering, architecture and urbanism
Paving seven miles in seven weeks
Methods used in construction of concrete highway near Everly, Ia.; contractor used single paver and poured 100 ft. per hr. average for entire job; dock for handling bulk cement; grading ahead of form setting.
Paving seven miles in seven weeks
Methods used in construction of concrete highway near Everly, Ia.; contractor used single paver and poured 100 ft. per hr. average for entire job; dock for handling bulk cement; grading ahead of form setting.
Paving seven miles in seven weeks
Contractors Engrs. Monthly
1931
4 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Drilling seven miles through solid granite
Engineering Index Backfile | 1956
Moving seven miles of pavement twelve feet sidewise
Engineering Index Backfile | 1935
|Signal corps span Africa -- In seven weeks
Engineering Index Backfile | 1944
|Paving 40-ft highway 16 miles long
Engineering Index Backfile | 1928
Hersey Dam Removal Project ``FREES'' Seven Miles of High-quality Trout Stream
British Library Conference Proceedings | 2007
|