A platform for research: civil engineering, architecture and urbanism
Drilling seven miles through solid granite
Power tunnel at Donnells Dam, part of Tri-Dam project, is 7.2 mi long, has section 27,180 ft long without adit; dimensions and flow; drilling procedure; booster fans every 2500 ft aid ventilation.
Drilling seven miles through solid granite
Power tunnel at Donnells Dam, part of Tri-Dam project, is 7.2 mi long, has section 27,180 ft long without adit; dimensions and flow; drilling procedure; booster fans every 2500 ft aid ventilation.
Drilling seven miles through solid granite
Western Construction
Western Construction ; 31
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Paving seven miles in seven weeks
Engineering Index Backfile | 1931
Moving seven miles of pavement twelve feet sidewise
Engineering Index Backfile | 1935
|Designed Granite: Solid-Surface Countertops through Compression Molding
British Library Online Contents | 1995
|Modifications to the GSI for granite in drilling
Online Contents | 2014
|Engineering Index Backfile | 1931