A platform for research: civil engineering, architecture and urbanism
Moving seven miles of pavement twelve feet sidewise
Concrete pavement slab 14 1/2 ft wide shoved 12 ft to one side and rebedded to form part of widened Brunswick Pike (N.J. 26, US1) south of New Brunswick; slab is cut across at intervals of 400 to 500 ft; flattened hose is inserted in open joint and inflated by compressed air, moving slab; mud-jack outfit raising slab by pumping cement-loam grout through drilled holes.
Moving seven miles of pavement twelve feet sidewise
Concrete pavement slab 14 1/2 ft wide shoved 12 ft to one side and rebedded to form part of widened Brunswick Pike (N.J. 26, US1) south of New Brunswick; slab is cut across at intervals of 400 to 500 ft; flattened hose is inserted in open joint and inflated by compressed air, moving slab; mud-jack outfit raising slab by pumping cement-loam grout through drilled holes.
Moving seven miles of pavement twelve feet sidewise
Eng News-Rec
Johannesson, S. (author)
Engineering News-Record ; 115
1935
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Paving seven miles in seven weeks
Engineering Index Backfile | 1931
Engineering Index Backfile | 1943
Wildcat 52 miles at sea in 103 feet of water
Engineering Index Backfile | 1956
|Device and method for preventing sidewise bending of inclined box girder
European Patent Office | 2024
|Drilling seven miles through solid granite
Engineering Index Backfile | 1956