A platform for research: civil engineering, architecture and urbanism
Full report on construction of hydraulic structures with special reference to concreting equipment and procedure; details of construction of diversion dam by tipping of reinforced concrete obelisk built on pedestal, on shore of Saguenay River; installation of electric equipment. (See also Engrs. Soc. West. Penn. -- Proc, vol. 47, no. 1, Jan. 1931, pp. 1-43, 29 figs.)
Full report on construction of hydraulic structures with special reference to concreting equipment and procedure; details of construction of diversion dam by tipping of reinforced concrete obelisk built on pedestal, on shore of Saguenay River; installation of electric equipment. (See also Engrs. Soc. West. Penn. -- Proc, vol. 47, no. 1, Jan. 1931, pp. 1-43, 29 figs.)
Chute a caron hydro-electric development
Eng. Soc. Boston -- Jl
Rickey, J.W. (author)
1931
26 pages
16 Figs., Bibliography
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Chute a caron hydro-electric development
Engineering Index Backfile | 1931
|Chute a caron hydro power development
Engineering Index Backfile | 1932
Engineering Index Backfile | 1929
|Construction of bridge at Chute-a-Caron
Engineering Index Backfile | 1927
|Concreting methods at the chute a caron dam
Engineering Index Backfile | 1930
|