A platform for research: civil engineering, architecture and urbanism
Railway bridge erected over Saguenay River by Alcoa Power Co. for railway built to transport materials for large power development; concreting operations carried on in winter; methods employed in erecting steel superstructure.
Railway bridge erected over Saguenay River by Alcoa Power Co. for railway built to transport materials for large power development; concreting operations carried on in winter; methods employed in erecting steel superstructure.
Construction of bridge at Chute-a-Caron
Can. Engr
Tennant, D.C. (author)
Canadian Engineer ; 53
1927
2 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|Chute a caron hydro-electric development
Engineering Index Backfile | 1931
|Chute a caron hydro power development
Engineering Index Backfile | 1932
Chute a caron hydro-electric development
Engineering Index Backfile | 1931
|Concreting methods at the chute a caron dam
Engineering Index Backfile | 1930
|