A platform for research: civil engineering, architecture and urbanism
Full report on construction of hydraulic structures with special reference to concreting equipment and procedure; details of construction of diversion dam by tipping of reinforced concrete obelisk built on pedestal, on shore of Saguenay River; installation of electric equipment. (see also Eng. Soc. Boston -- Jl., vol. 2, no. 7, Sept. 1931, pp. 9-34, 16 figs.)
Full report on construction of hydraulic structures with special reference to concreting equipment and procedure; details of construction of diversion dam by tipping of reinforced concrete obelisk built on pedestal, on shore of Saguenay River; installation of electric equipment. (see also Eng. Soc. Boston -- Jl., vol. 2, no. 7, Sept. 1931, pp. 9-34, 16 figs.)
Chute a caron hydro-electric development
Engrs. Soc. West. Penn. -- Proc
Rickey, J.W. (author)
1931
43 pages
29 Figs., Bibliography
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Chute a caron hydro-electric development
Engineering Index Backfile | 1931
|Chute a caron hydro power development
Engineering Index Backfile | 1932
Engineering Index Backfile | 1929
|Construction of bridge at Chute-a-Caron
Engineering Index Backfile | 1927
|Concreting methods at the chute a caron dam
Engineering Index Backfile | 1930
|