A platform for research: civil engineering, architecture and urbanism
Cableway handles all material for 288-foot concrete arch bridge
Construction of Henry Avenue Bridge over Wissahickon gorge in Fairmount Park, Philadelphia; main arch span 288 ft. and 99 ft. rise; use of fabricated steel falsework, as high as average 12-story building; movement of all material downward from cable line; falsework used twice; materials handling from freight yard.
Cableway handles all material for 288-foot concrete arch bridge
Construction of Henry Avenue Bridge over Wissahickon gorge in Fairmount Park, Philadelphia; main arch span 288 ft. and 99 ft. rise; use of fabricated steel falsework, as high as average 12-story building; movement of all material downward from cable line; falsework used twice; materials handling from freight yard.
Cableway handles all material for 288-foot concrete arch bridge
Contractors Engrs. Monthly
Wittkorn, T.H. (author)
1931
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
1,500-ft. Cableway handles concrete on wilkes-barre multiple-arch bridge
Engineering Index Backfile | 1930
|Cableway handles concrete at Pickwick Landing dam
Engineering Index Backfile | 1937
Oregon steel arch bridge erected by cableway
Engineering Index Backfile | 1926
|Cableway handles relining of Cleveland water basin
Engineering Index Backfile | 1917
A forty-foot concrete arch highway bridge
Engineering Index Backfile | 1896