A platform for research: civil engineering, architecture and urbanism
Cableway handles concrete at Pickwick Landing dam
Design and operation of fixed 12-ton cableway, 1270 ft long, to transfer concrete from central mixing plant to working areas in cofferdams for second and third construction stages of Tennessee Valley Authority Pickwick Landing dam; concrete placing by gantry cranes.
Cableway handles concrete at Pickwick Landing dam
Design and operation of fixed 12-ton cableway, 1270 ft long, to transfer concrete from central mixing plant to working areas in cofferdams for second and third construction stages of Tennessee Valley Authority Pickwick Landing dam; concrete placing by gantry cranes.
Cableway handles concrete at Pickwick Landing dam
Construction Methods Equipment
1937
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1941
Cableway handles all material for 288-foot concrete arch bridge
Engineering Index Backfile | 1931
|Cableway handles relining of Cleveland water basin
Engineering Index Backfile | 1917
1,500-ft. Cableway handles concrete on wilkes-barre multiple-arch bridge
Engineering Index Backfile | 1930
|Proposed New Lock Pickwick Landing Dam
NTIS | 1972