A platform for research: civil engineering, architecture and urbanism
Cableway handles relining of Cleveland water basin
Reservoir reinforced with 18,000 yards of concrete placed without erecting construction plant on roof. (1500 w.) (82584)
Cableway handles relining of Cleveland water basin
Reservoir reinforced with 18,000 yards of concrete placed without erecting construction plant on roof. (1500 w.) (82584)
Cableway handles relining of Cleveland water basin
Eng News-Rec
1917
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cableway handles concrete at Pickwick Landing dam
Engineering Index Backfile | 1937
Cableway handles all material for 288-foot concrete arch bridge
Engineering Index Backfile | 1931
|1,500-ft. Cableway handles concrete on wilkes-barre multiple-arch bridge
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1930
|