A platform for research: civil engineering, architecture and urbanism
Falsework carries traffic as girder span goes to new site
How move of steel span bridge on Missouri Pacific that was required by line-relocation job was carried out by hauling girders one by one on flat car while deck systems were supported on temporary false work at old and new locations is described.
Falsework carries traffic as girder span goes to new site
How move of steel span bridge on Missouri Pacific that was required by line-relocation job was carried out by hauling girders one by one on flat car while deck systems were supported on temporary false work at old and new locations is described.
Falsework carries traffic as girder span goes to new site
Ry Track Structures
1964
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rigid-frame concrete span requires no falsework
Engineering Index Backfile | 1945
|Falsework plate girder failure and bridge outrigger problems
British Library Conference Proceedings | 2005
|Longest plate-girder span in western hemisphere carries turnpike through New Haven
Engineering Index Backfile | 1958
|Steel erectors span busy river on limited falsework
Engineering Index Backfile | 1929
Existing girders act as falsework for new truss span
Engineering Index Backfile | 1963