A platform for research: civil engineering, architecture and urbanism
Testing of pressure tunnel of Mazatepec hydroelectric power plant
In order to investigate actual working conditions of tunnel, test section 500 m long was selected, in which geological conditions proved to be worst and in which cement absorptions during grouting were highest; pressure test indicates that there is no danger due to maximum pressure and leakage of water.
Testing of pressure tunnel of Mazatepec hydroelectric power plant
In order to investigate actual working conditions of tunnel, test section 500 m long was selected, in which geological conditions proved to be worst and in which cement absorptions during grouting were highest; pressure test indicates that there is no danger due to maximum pressure and leakage of water.
Testing of pressure tunnel of Mazatepec hydroelectric power plant
Ensaye del tunel de presion de la planta Mazatepec
Sanchez Trejo, R. (author)
Ingenieria (Mexico) ; 32
1962
9 pages
3 Plates
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of pressure tunnel for Vermunt hydroelectric power plant
Engineering Index Backfile | 1931
|Driving of pressure tunnel of Mont-Cenis hydroelectric power development
Engineering Index Backfile | 1968
|