A platform for research: civil engineering, architecture and urbanism
Construction of pressure tunnel for Vermunt hydroelectric power plant
Concrete-lined circular tunnel 2.80 m. in diam., 2480 m. long; leakage tests made at pressures of 3 to 3.5 atm.
Construction of pressure tunnel for Vermunt hydroelectric power plant
Concrete-lined circular tunnel 2.80 m. in diam., 2480 m. long; leakage tests made at pressures of 3 to 3.5 atm.
Construction of pressure tunnel for Vermunt hydroelectric power plant
Der Bau des Druckstollens fuer das Kraftwerk Vermunt
Walter, H. (author)
1931
4 pages
2 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Testing of pressure tunnel of Mazatepec hydroelectric power plant
Engineering Index Backfile | 1962
|Krasnoyarsk hydroelectric power plant construction, a new phase of hydroelectric development
Online Contents | 1970
Krasnoyarsk hydroelectric power plant construction, a new phase of hydroelectric development
Springer Verlag | 1970
Construction of Ackersand II hydroelectric power plant
Engineering Index Backfile | 1959
|