A platform for research: civil engineering, architecture and urbanism
Major civil engineering projects completed in snowy mountains scheme
Features of development of Snowy Mountains hydroelectric scheme for diversion of Eucumbene and Murrumbridgee rivers through Great Dividing Range to series of underground power stations; details of 381 ft high Adaminaby Dam to provide storage of 3.5 million acre ft, 13.8 mi Eucumbene-Tumut Tunnel, Tumut Pond Dam, and 320 Mw T-1 power station 1200 ft below ground level.
Major civil engineering projects completed in snowy mountains scheme
Features of development of Snowy Mountains hydroelectric scheme for diversion of Eucumbene and Murrumbridgee rivers through Great Dividing Range to series of underground power stations; details of 381 ft high Adaminaby Dam to provide storage of 3.5 million acre ft, 13.8 mi Eucumbene-Tumut Tunnel, Tumut Pond Dam, and 320 Mw T-1 power station 1200 ft below ground level.
Major civil engineering projects completed in snowy mountains scheme
Commonwealth Engr
1958
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1958
|Tunneling -- Snowy mountains scheme in second stage
Engineering Index Backfile | 1965
Engineering Index Backfile | 1953
|AUSTRALASIA - 50 years on -- The Snowy Mountains hydroelectric: Scheme
Online Contents | 1999