A platform for research: civil engineering, architecture and urbanism
New bridge at Albury is designed to have three spans of post-tensioned prestressed concrete girders, each 100 ft long, supported on reinforced concrete piers and abutments founded on concrete piles; four vehicular traffic lanes, two cycle and two pedestrian footpaths will have total width of 88 ft 6 in.
New bridge at Albury is designed to have three spans of post-tensioned prestressed concrete girders, each 100 ft long, supported on reinforced concrete piers and abutments founded on concrete piles; four vehicular traffic lanes, two cycle and two pedestrian footpaths will have total width of 88 ft 6 in.
Design of prestressed concrete highway bridge over Murray river at Albury, N.S.W
Instn Engrs, Australia -- J
Fried, A. (author)
1958
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hawkesbury river high bridge, N.S.W.
Engineering Index Backfile | 1954
|Construction of highway bridge across Hawkesbury river at Peat's Ferry, N.S.W
Engineering Index Backfile | 1953
|Prestressed-concrete bridge over river Tame
Engineering Index Backfile | 1950
Prestressed-concrete bridge over river Tame
Engineering Index Backfile | 1950
Prestressed-concrete bridge over river Tame
Engineering Index Backfile | 1950