A platform for research: civil engineering, architecture and urbanism
Under water
Description of the successful construction of a pier by using concrete in situ. under 20 ft. of water. Concrete lowered in a box 20 cubic ft. capacity and directed by diver. This method found cheaper than that of using set blocks of concrete. (See also Lon. Eng. Oct. 7 1892, pp. 456-7)
Under water
Description of the successful construction of a pier by using concrete in situ. under 20 ft. of water. Concrete lowered in a box 20 cubic ft. capacity and directed by diver. This method found cheaper than that of using set blocks of concrete. (See also Lon. Eng. Oct. 7 1892, pp. 456-7)
Under water
Eng Rec
1892
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1892
ASCE | 2021
|Engineering Index Backfile | 1961
Online Contents | 2014
|British Library Conference Proceedings | 1996
|