A platform for research: civil engineering, architecture and urbanism
Investigations into causes of subsidence in earth reservoir embankment
Causes of subsidence on earth embankment and remedial measures to safeguard stability; investigations were carried out through shaft 8 ft square; reservoir situated in moorland has capacity of 163 m gal with maximum depth of 29 ft; embankment is earthwork 470 ft long and 39 ft high with puddle clay core; weakness in structure lay in fissured character of upper rock layers.
Investigations into causes of subsidence in earth reservoir embankment
Causes of subsidence on earth embankment and remedial measures to safeguard stability; investigations were carried out through shaft 8 ft square; reservoir situated in moorland has capacity of 163 m gal with maximum depth of 29 ft; embankment is earthwork 470 ft long and 39 ft high with puddle clay core; weakness in structure lay in fissured character of upper rock layers.
Investigations into causes of subsidence in earth reservoir embankment
Instn Mun Engrs -- J
Wilson, A. (author)
1950
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Subsidence in earth reservoir embankment
Engineering Index Backfile | 1949
|Building the earth embankment for hill view reservoir
Engineering Index Backfile | 1915
|Reservoir embankment construction method and reservoir embankment waterproof structure
European Patent Office | 2018
|The Reaction of Embankment to Longwall Mining Subsidence
British Library Conference Proceedings | 2021
|Circular Earth Embankment lined with concrete forms oil reservoir
Engineering Index Backfile | 1918
|