A platform for research: civil engineering, architecture and urbanism
Reservoir situated in moorland has capacity of 163 million gal with max depth of 29 ft; embankment, earthwork structure with puddle clay core, is 470 ft in length and 39 ft high; after construction had begun, embankments were heightened by 2 ft; settlement occurred always at same place during heavy rainfalls; cause of settlement was badly shattered surface of rock on which dam was founded; remedial measures.
Reservoir situated in moorland has capacity of 163 million gal with max depth of 29 ft; embankment, earthwork structure with puddle clay core, is 470 ft in length and 39 ft high; after construction had begun, embankments were heightened by 2 ft; settlement occurred always at same place during heavy rainfalls; cause of settlement was badly shattered surface of rock on which dam was founded; remedial measures.
Subsidence in earth reservoir embankment
Surveyor
Wilson, A. (author)
1949
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Investigations into causes of subsidence in earth reservoir embankment
Engineering Index Backfile | 1950
|Building the earth embankment for hill view reservoir
Engineering Index Backfile | 1915
|Reservoir embankment construction method and reservoir embankment waterproof structure
European Patent Office | 2018
|The Reaction of Embankment to Longwall Mining Subsidence
British Library Conference Proceedings | 2021
|Circular Earth Embankment lined with concrete forms oil reservoir
Engineering Index Backfile | 1918
|