A platform for research: civil engineering, architecture and urbanism
Construction starts on cascade dam
Illustrated description of final phase of earth fill dam in Idaho, 800 ft long, 100 ft high from bed of Payette River; part of irrigation project is 319-ft long tunnel to be drilled through solid granite rock; excavation bore is lined with 1-in. concrete; data on equipment, batching and mixing plant, and railroad relocation.
Construction starts on cascade dam
Illustrated description of final phase of earth fill dam in Idaho, 800 ft long, 100 ft high from bed of Payette River; part of irrigation project is 319-ft long tunnel to be drilled through solid granite rock; excavation bore is lined with 1-in. concrete; data on equipment, batching and mixing plant, and railroad relocation.
Construction starts on cascade dam
Pac Bldr Engr
1946
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction Reports. Housing Starts
NTIS | 1971
Indicators - Construction Volume; Housing starts
Online Contents | 1995
Construction Starts on Maghreb Pipeline
Online Contents | 1994
Construction starts at Morrow point
Engineering Index Backfile | 1963
|Construction starts soon on Hoover Dam
Engineering Index Backfile | 1931