A platform for research: civil engineering, architecture and urbanism
Construction features at U S Bureau of Reclamation's first double curvature, thin-arch dam on Gunnison River, Colo, and underground power plant with 2 60,000-kw generators; dam will be 465 ft high above foundation and will have 720 ft crest length; access problems, geology of site, diversion plan, concrete placing and mix design, underground power plant, free-fall spillway and outlet works are described.
Construction features at U S Bureau of Reclamation's first double curvature, thin-arch dam on Gunnison River, Colo, and underground power plant with 2 60,000-kw generators; dam will be 465 ft high above foundation and will have 720 ft crest length; access problems, geology of site, diversion plan, concrete placing and mix design, underground power plant, free-fall spillway and outlet works are described.
Construction starts at Morrow point
Western Construction
Bellport, B.P. (author)
Western Construction ; 38
1963
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Morrow Point Power Plant and Dam
ASCE | 2021
|Engineering Index Backfile | 1968
|Morrow point underground powerplant
Engineering Index Backfile | 1965
|Seismic Analysis of Morrow Point Dam
NTIS | 2002
|Morrow Point dam is Burec first
Engineering Index Backfile | 1964