A platform for research: civil engineering, architecture and urbanism
Jacking barges install foundations for 4-mile crossing
Structure of 21,800-ft-long Astoria Bridge across Columbia River, connecting Oregon and Washington, comprises 2 high-level, steel truss bridges over ship channels; more than 11,000 ft of prestressed concrere roadway supported by hollow, cylindrical concrete piles crosses stretch of sandy shallows; placing of pier shells and beams and driving of more than 3700 steel and concrete piles up to 180 ft long from 3 special jacking barges which float only when moving between work locations, are described. (see also Construction Methods and Equipment v 45 n 10 Oct 1963 p 91-5)
Jacking barges install foundations for 4-mile crossing
Structure of 21,800-ft-long Astoria Bridge across Columbia River, connecting Oregon and Washington, comprises 2 high-level, steel truss bridges over ship channels; more than 11,000 ft of prestressed concrere roadway supported by hollow, cylindrical concrete piles crosses stretch of sandy shallows; placing of pier shells and beams and driving of more than 3700 steel and concrete piles up to 180 ft long from 3 special jacking barges which float only when moving between work locations, are described. (see also Construction Methods and Equipment v 45 n 10 Oct 1963 p 91-5)
Jacking barges install foundations for 4-mile crossing
Eng News-Rec
Engineering News-Record ; 171
1963
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Jacking barges install foundations for 4-mile crossing
Engineering Index Backfile | 1963
Engineering Index Backfile | 1920