A platform for research: civil engineering, architecture and urbanism
Prestressed precast footbridge
Footbridge, span 61 ft 8 in. at Methley Savile Colliery, Yorkshire, comprises two prestressed, precast beams spaced 8 ft apart, carrying on their bottom flanges deck consisting of precast slabs and on their upper flanges precast beams supporting roof of asbestos cement sheets covered with bituminous felt; bridge spans road and single railway track.
Prestressed precast footbridge
Footbridge, span 61 ft 8 in. at Methley Savile Colliery, Yorkshire, comprises two prestressed, precast beams spaced 8 ft apart, carrying on their bottom flanges deck consisting of precast slabs and on their upper flanges precast beams supporting roof of asbestos cement sheets covered with bituminous felt; bridge spans road and single railway track.
Prestressed precast footbridge
Concrete Constr Eng
1955
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed concrete footbridge
Engineering Index Backfile | 1946
Prestressed footbridge at Edinburgh
Engineering Index Backfile | 1952
Tensegrity Footbridge with Prestressed Deck
Springer Verlag | 2025
|Plymouth's new prestressed concrete footbridge
Engineering Index Backfile | 1953
Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1952
|