A platform for research: civil engineering, architecture and urbanism
Carrying out construction work in winter in Norway
Problem of protecting concrete against freezing during setting period in earth and masonry work; construction of railway bridge near Mo i Rana which is situated just below Polar Circle; work carried out with conventional equipment at temperatures up to -- 13 F.
Carrying out construction work in winter in Norway
Problem of protecting concrete against freezing during setting period in earth and masonry work; construction of railway bridge near Mo i Rana which is situated just below Polar Circle; work carried out with conventional equipment at temperatures up to -- 13 F.
Carrying out construction work in winter in Norway
Bouwen in de winter in Noorwegen. Enkele gezichtspunten en gegevens
Degenaars, T. (author)
Ingenieur ; 69
1957
Article (Journal)
Dutch
© Metadata Copyright Elsevier B. V. All rights reserved.
Winter construction provides work relief
Engineering Index Backfile | 1932
Winter Friction Project in Norway
British Library Conference Proceedings | 2001
|Winter Friction Project in Norway
British Library Online Contents | 2001
|Construction of the Games Arenas for the 1994 Winter Olympics in Norway
Online Contents | 1995
|Fast work is feature of Buffalo winter construction
Engineering Index Backfile | 1924