A platform for research: civil engineering, architecture and urbanism
Guy-Derrick traveler erects high spans. construction methods and equipment
Novel bridge erection method used to span pair of steep mountain gorges in northern California; Bethlehem Pacific Steel Corp ran special derrick over narrow temporary steel girder cantilevers, hoisted 107-ft girders from canyon floor, and then converted them to simply supported spans; two bridges span Pipe Creek and Putah Creek in Napa County; they consist mostly of 164-ft twin plate girders spaced 18 ft apart. (See also Construction Methods and Equipment v 3 n 4 Apr 1957 p 68-9)
Guy-Derrick traveler erects high spans. construction methods and equipment
Novel bridge erection method used to span pair of steep mountain gorges in northern California; Bethlehem Pacific Steel Corp ran special derrick over narrow temporary steel girder cantilevers, hoisted 107-ft girders from canyon floor, and then converted them to simply supported spans; two bridges span Pipe Creek and Putah Creek in Napa County; they consist mostly of 164-ft twin plate girders spaced 18 ft apart. (See also Construction Methods and Equipment v 3 n 4 Apr 1957 p 68-9)
Guy-Derrick traveler erects high spans. construction methods and equipment
Western Construction
Western Construction ; 32
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Guy-Derrick traveler erects high spans. construction methods and equipment
Engineering Index Backfile | 1957
Floating tower derrick erects arch spans over Susquehanna River
Engineering Index Backfile | 1940
Gantry erects big girders for spans
Engineering Index Backfile | 1961
Wall-top traveler erects big T-beams
Engineering Index Backfile | 1964
Traveler erects heavy trusses for theater roof
Engineering Index Backfile | 1926