A platform for research: civil engineering, architecture and urbanism
Gantry erects big girders for spans
Construction of twin bridge spans across Platte River; structure consists of 14 twin spans supported by 2 rows of concrete piers; piers rest on prestressed concrete piles; each of 110 ft spans consists of 6 prestressed girders; cofferdam cells around piers were dewatered by 30,000 gpm Stang wellpoint system; rail mounted gantry put girders into place.
Gantry erects big girders for spans
Construction of twin bridge spans across Platte River; structure consists of 14 twin spans supported by 2 rows of concrete piers; piers rest on prestressed concrete piles; each of 110 ft spans consists of 6 prestressed girders; cofferdam cells around piers were dewatered by 30,000 gpm Stang wellpoint system; rail mounted gantry put girders into place.
Gantry erects big girders for spans
Construction Methods Equipment
1961
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Floating tower derrick erects arch spans over Susquehanna River
Engineering Index Backfile | 1940
Guy-Derrick traveler erects high spans. construction methods and equipment
Engineering Index Backfile | 1957
Guy-Derrick traveler erects high spans. construction methods and equipment
Engineering Index Backfile | 1957
Highline erects Arizona bridge
Engineering Index Backfile | 1965
Parallel lattice girders for long spans
Engineering Index Backfile | 1926
|