A platform for research: civil engineering, architecture and urbanism
Half-through-type bridge with precast prestressed concrete deck
Bridge with prefabricated deck units of steel beams and reinforced concrete bolted to welded mild steel main girders, for Western Region lines of British railways; object is to reduce site work during erection and produce span requiring minimum of maintenance; decking consists of concrete slab units, 10 in. thick and 6 ft in width, spanning between inclined faces of stiffeners on main girders.
Half-through-type bridge with precast prestressed concrete deck
Bridge with prefabricated deck units of steel beams and reinforced concrete bolted to welded mild steel main girders, for Western Region lines of British railways; object is to reduce site work during erection and produce span requiring minimum of maintenance; decking consists of concrete slab units, 10 in. thick and 6 ft in width, spanning between inclined faces of stiffeners on main girders.
Half-through-type bridge with precast prestressed concrete deck
Ry Gaz
Railway Gazette ; 99
1953
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Full-depth two-way precast prestressed concrete bridge deck system
British Library Conference Proceedings | 1998
|Prestressed precast bridge deck erected in eight days
Engineering Index Backfile | 1957
|Precast concrete bridge deck slabs
Engineering Index Backfile | 1950