A platform for research: civil engineering, architecture and urbanism
Prestressed bridge: 120-Ft span erected daily
Prefabrication of reinforcing cages and in place fabrication of prestressed beams speeds construction of 1677-ft long highway bridge over Connecticut River near Hartford; structure will stand on 13 reinforced concrete piers, first 12 being placed 120 ft on centers, last is 118 ft 9 in.; bridge consists of post tensioned concrete girders, eight to each full span; foundations are of reinforced concrete, elliptical in shape, 81 to 87 ft long and 16 ft wide.
Prestressed bridge: 120-Ft span erected daily
Prefabrication of reinforcing cages and in place fabrication of prestressed beams speeds construction of 1677-ft long highway bridge over Connecticut River near Hartford; structure will stand on 13 reinforced concrete piers, first 12 being placed 120 ft on centers, last is 118 ft 9 in.; bridge consists of post tensioned concrete girders, eight to each full span; foundations are of reinforced concrete, elliptical in shape, 81 to 87 ft long and 16 ft wide.
Prestressed bridge: 120-Ft span erected daily
Eng News-Rec
Engineering News-Record ; 159
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed precast bridge deck erected in eight days
Engineering Index Backfile | 1957
|Prestressed bridge is erected in just a day
Engineering Index Backfile | 1961
|Free-span prestressed concrete bridge
Engineering Index Backfile | 1952
|Brazilians build 15-span prestressed concrete bridge
Engineering Index Backfile | 1949
Gladesville bridge; 305-m span prestressed concrete arch bridge
Engineering Index Backfile | 1965
|