A platform for research: civil engineering, architecture and urbanism
Construction of fleet bridge
Bridge near Brighton, is at angle of skew to river of 23°, its width, between wrought iron railings of parapet is 36 ft, deck is 22 ft wide and there are two 7 ft wide footpaths; bridge consists of nine prestressed concrete longitudinal beams which have span between bearing points of 67 ft 5 3/8 in.; formwork erected on reinforced concrete invert. (see also Roads and Road Construction v 34 n 408 Dec 1956 p 384-6; Constructional Rev v 30 n 1 Jan 1957 p 31-4)
Construction of fleet bridge
Bridge near Brighton, is at angle of skew to river of 23°, its width, between wrought iron railings of parapet is 36 ft, deck is 22 ft wide and there are two 7 ft wide footpaths; bridge consists of nine prestressed concrete longitudinal beams which have span between bearing points of 67 ft 5 3/8 in.; formwork erected on reinforced concrete invert. (see also Roads and Road Construction v 34 n 408 Dec 1956 p 384-6; Constructional Rev v 30 n 1 Jan 1957 p 31-4)
Construction of fleet bridge
Civ Eng (Lond)
Civil Engineering ; 51
1956
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
Engineering Index Backfile | 1957
Engineering Index Backfile | 1928
Strengthening Holt Fleet Bridge
British Library Online Contents | 2011
|The reconstruction of Holt Fleet Bridge, Worcestershire
Engineering Index Backfile | 1929