A platform for research: civil engineering, architecture and urbanism
Use of train loader and slusher combination which could be supplemented with mucking machine if this proved necessary in construction of Tehachapi exploratory tunnel crossing California Aqueduct in Kern County; tunnel is 3600 ft long, 8 ft high, and 6 ft wide; train loader avoided necessity of switching cars in narrow tunnel where both extremely high pressures and bad ground, together with possible heavy water conditions, were anticipated; train is unusual in that it is mounted on double truck wheels, at ends of long one-piece car, which provide flexibility for following curves of track; air-powered slusher is drawn by 8-ton Plymouth diesel locomotive.
Use of train loader and slusher combination which could be supplemented with mucking machine if this proved necessary in construction of Tehachapi exploratory tunnel crossing California Aqueduct in Kern County; tunnel is 3600 ft long, 8 ft high, and 6 ft wide; train loader avoided necessity of switching cars in narrow tunnel where both extremely high pressures and bad ground, together with possible heavy water conditions, were anticipated; train is unusual in that it is mounted on double truck wheels, at ends of long one-piece car, which provide flexibility for following curves of track; air-powered slusher is drawn by 8-ton Plymouth diesel locomotive.
Slusher train adapts to ground
Western Construction
Russell, J.K. (author)
Western Construction ; 40
1965
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Multi-multiplying-power lifting mechanism of mechanical decontamination slusher
European Patent Office | 2016
|Online Contents | 1995
Engineering Index Backfile | 1963
|Spray equipment adapts for success
British Library Online Contents | 2003
Engineering Index Backfile | 1968