A platform for research: civil engineering, architecture and urbanism
Report on construction, 2 1/4 mi long at cost of $60,000,000; restoration of subsurface utilities; stations; by-passing of gas mains; underpinning of elevated columns and buildings; excavation; decking; construction of two tracks by cast iron lined tunnel by use of shield under compressed air; construction of rock tunnels; reconstruction of Hudson and Manhattan Railroad. (See also - discussion p 47-64 and (discussion) 2nd Quarterly issue 1940 p 65-104; Gen Contractors Assn -- Bul v 31 n 10 Oct 1940 p 261-70 (discussion) 270-1 and 275-6)
Report on construction, 2 1/4 mi long at cost of $60,000,000; restoration of subsurface utilities; stations; by-passing of gas mains; underpinning of elevated columns and buildings; excavation; decking; construction of two tracks by cast iron lined tunnel by use of shield under compressed air; construction of rock tunnels; reconstruction of Hudson and Manhattan Railroad. (See also - discussion p 47-64 and (discussion) 2nd Quarterly issue 1940 p 65-104; Gen Contractors Assn -- Bul v 31 n 10 Oct 1940 p 261-70 (discussion) 270-1 and 275-6)
Construction of sixth avenue subway
Mun Engrs J
Houghtaling, B. (author)
1940
25 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Sixth Avenue subway
Engineering Index Backfile | 1965
|Construction of sixth avenue subway
Engineering Index Backfile | 1940
|Tunnel construction, Sixth Avenue Subway, New York, N.Y
Engineering Index Backfile | 1941
|Tunnel Construction, Sixth Avenue Subway, New York, NY
ASCE | 2021
|Tunnel construction, sixth avenue subway, New York, N.Y.
Engineering Index Backfile | 1941
|