A platform for research: civil engineering, architecture and urbanism
Planning and organization of work for construction of one double-track and two single-track tunnels driven for three blocks under busy city street, under foundations of operating elevated railroad, very close to buildings varying from 2 to 16 stories in height, through variety of rock formations and with scant cover, as part of contract Section 10 of Sixth Avenue Subway; specifications; borings, geology of subsurface. (See also - n 9 (discussion) Nov 1941 p 1759-60)
Planning and organization of work for construction of one double-track and two single-track tunnels driven for three blocks under busy city street, under foundations of operating elevated railroad, very close to buildings varying from 2 to 16 stories in height, through variety of rock formations and with scant cover, as part of contract Section 10 of Sixth Avenue Subway; specifications; borings, geology of subsurface. (See also - n 9 (discussion) Nov 1941 p 1759-60)
Tunnel construction, Sixth Avenue Subway, New York, N.Y
Am Soc Civ Engrs -- Proc
Feld, J. (author)
1941
36 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tunnel Construction, Sixth Avenue Subway, New York, NY
ASCE | 2021
|Tunnel construction, sixth avenue subway, New York, N.Y.
Engineering Index Backfile | 1941
|Tunnel construction, sixth avenue subway, New York, N.Y.
Engineering Index Backfile | 1942
|Construction of Sixth Avenue subway
Engineering Index Backfile | 1965
|Construction of sixth avenue subway
Engineering Index Backfile | 1940
|