A platform for research: civil engineering, architecture and urbanism
New Lirette-New Orleans line completed
Notes on construction of 35 mi of 12-in. line, connecting with Long Lake and Lirette fields in Southern Louisiana and "tying in" with Baton Rouge New Orleans 18 in. main loop lines; technique in crossing bayous and canals; Mississippi River crossing; pipe coating.
New Lirette-New Orleans line completed
Notes on construction of 35 mi of 12-in. line, connecting with Long Lake and Lirette fields in Southern Louisiana and "tying in" with Baton Rouge New Orleans 18 in. main loop lines; technique in crossing bayous and canals; Mississippi River crossing; pipe coating.
New Lirette-New Orleans line completed
Gas Age
Gas Age ; 86
1940
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Greater New Orleans bridge completed
Engineering Index Backfile | 1958
|Unusual overpass completed for city of New Orleans
Engineering Index Backfile | 1950
Pioneer submarine gas line project completed
Engineering Index Backfile | 1951
|Automation system installation completed on Portuguese line
Online Contents | 1997
|Longest single-span pipe line bridge is completed
Engineering Index Backfile | 1932
|