A platform for research: civil engineering, architecture and urbanism
Making and placing of concrete for multiple arch dam over Grand River, consisting principally of 51 concrete arches, 140 ft high in river bed, resting against hollow buttresses 84 ft center to center; crane and bucket placement; concrete batching plant; design of arches and buttresses. (See also Eng News-Rec v 124 n 5 Feb 1 1940 p 42-6)
Making and placing of concrete for multiple arch dam over Grand River, consisting principally of 51 concrete arches, 140 ft high in river bed, resting against hollow buttresses 84 ft center to center; crane and bucket placement; concrete batching plant; design of arches and buttresses. (See also Eng News-Rec v 124 n 5 Feb 1 1940 p 42-6)
Concrete for pensacola dam
Concrete Constr Eng
Fuller, M.G. (author)
1940
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1941
|Wave Transformation at Pensacola Pass, Florida
British Library Online Contents | 1997
|