A platform for research: civil engineering, architecture and urbanism
Making and placing of concrete for multiple arch dam over Grand River, consisting principally of 51 concrete arches, 140 ft high in river bed, resting against hollow buttresses 84 ft center to center; crane and bucket placement; concrete batching plant; design of arches and buttresses. (see also Concrete and Constr Eng v 35 n 9 Sept 1940 p 443-6)
Making and placing of concrete for multiple arch dam over Grand River, consisting principally of 51 concrete arches, 140 ft high in river bed, resting against hollow buttresses 84 ft center to center; crane and bucket placement; concrete batching plant; design of arches and buttresses. (see also Concrete and Constr Eng v 35 n 9 Sept 1940 p 443-6)
Concrete for Pensacola dam
Eng News-Rec
Fuller, M.G. (author)
Engineering News-Record ; 124
1940
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1941
|Wave Transformation at Pensacola Pass, Florida
British Library Online Contents | 1997
|