A platform for research: civil engineering, architecture and urbanism
Description of 80,000-hp power development on Grand River in Northeast Oklahoma, known as Pensacola Project; details of combination hydroelectric flood control dam which is longest known multiple arch dam; power house and equipment details given.
Description of 80,000-hp power development on Grand River in Northeast Oklahoma, known as Pensacola Project; details of combination hydroelectric flood control dam which is longest known multiple arch dam; power house and equipment details given.
Pensacola dam completed
Power Plant Eng
Robards, H.D. (author)
1941
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1940
|Wave Transformation at Pensacola Pass, Florida
British Library Online Contents | 1997
|