A platform for research: civil engineering, architecture and urbanism
Job-site casting yard is key to stadium
23,000 concrete units, some weighing 32-tons, in 6-acre casting yard erected in center field for construction of Los Angeles Dodgers stadium; 124-ft high grandstand has 3 major cantilever tiers built on 78 precast bents spaced 12 to 29 ft apart; 29-ft high, steel framed concrete bleacher sections are designed so that they can be dismantled and moved back to expand stadium for pageants and exhibitions.
Job-site casting yard is key to stadium
23,000 concrete units, some weighing 32-tons, in 6-acre casting yard erected in center field for construction of Los Angeles Dodgers stadium; 124-ft high grandstand has 3 major cantilever tiers built on 78 precast bents spaced 12 to 29 ft apart; 29-ft high, steel framed concrete bleacher sections are designed so that they can be dismantled and moved back to expand stadium for pageants and exhibitions.
Job-site casting yard is key to stadium
Eng News -- Rec
Engineering News-Record ; 168
1962
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Unique pre-casting forms highlight on-site yard for stadium roof
Engineering Index Backfile | 1969
|On-site casting yard mass produces prestressed piles and beams
Engineering Index Backfile | 1961
Casting yard features new rigs
Engineering Index Backfile | 1963
RFK Stadium Site Redevelopment Study
NTIS | 2006
Wellington Regional Stadium Site Assessment
British Library Conference Proceedings | 1995
|