A platform for research: civil engineering, architecture and urbanism
Erection of new bridge trusses over the Guadalope River
Two piers and abutments support three trusses for single track of railroad from Zaragoza to Barcelona, at crossing of Guadalope River; central span 44 m., approaches 36 m.; describes method worked out for erection of new trusses and removal of old, without appreciable interruption of train service.
Erection of new bridge trusses over the Guadalope River
Two piers and abutments support three trusses for single track of railroad from Zaragoza to Barcelona, at crossing of Guadalope River; central span 44 m., approaches 36 m.; describes method worked out for erection of new trusses and removal of old, without appreciable interruption of train service.
Erection of new bridge trusses over the Guadalope River
Montaje de los nuevos tramos sobre el rio Guadalope
Mendiza&grave (author) / bal, D. (author)
1928
3 pages
3 Figs.
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Fast erection of building trusses
Engineering Index Backfile | 1940
Erection of Columbia River Bridge erection
Engineering Index Backfile | 1894
Erection of arch bridge over Kawarau river
Engineering Index Backfile | 1963
|British Library Conference Proceedings | 1993
|Design, Manufacture and Erection of Timber Trusses
NTIS | 1987
|