A platform for research: civil engineering, architecture and urbanism
Pickwick landing project
Definitive report on design, construction and initial operation of reservoir and dam project of Tennessee Valley Authority, consisting principally of hydraulic fill and rolled embankment 4687 ft long, 55 ft high, concrete gravity spillway 1141 ft long, plus navigation lock 110 ft wide by 600 ft long, max lift 63 ft, also power house of ultimate capacity of 144,000 kw, etc; hydraulic model tests.
Pickwick landing project
Definitive report on design, construction and initial operation of reservoir and dam project of Tennessee Valley Authority, consisting principally of hydraulic fill and rolled embankment 4687 ft long, 55 ft high, concrete gravity spillway 1141 ft long, plus navigation lock 110 ft wide by 600 ft long, max lift 63 ft, also power house of ultimate capacity of 144,000 kw, etc; hydraulic model tests.
Pickwick landing project
U S Tenn Valley Authority -- Tech Report
1941
431 pages
Figures, Diagrams, Tables
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pickwick Landing Dam South Embankment Seismic Upgrade Project
TIBKAT | 2021
|Pickwick Landing Dam South Embankment Seismic Upgrade Project
British Library Conference Proceedings | 2021
|Proposed New Lock Pickwick Landing Dam
NTIS | 1972
Spillway gates at pickwick landing dam
Engineering Index Backfile | 1938
Cableway handles concrete at Pickwick Landing dam
Engineering Index Backfile | 1937