A platform for research: civil engineering, architecture and urbanism
Design and construction features of Claytor hydro development
Description of concrete gravity spillway dam, about 130 ft max height, 540 ft long, built by American Gas and Electric Co on New River near Radford, Va, featuring elaborate grouting and foundation consolidation and sand-asphalt cutoff; geology of site; concreting procedure; joints in concrete; provision for flood flows. (See also - editorial comment p 390)
Design and construction features of Claytor hydro development
Description of concrete gravity spillway dam, about 130 ft max height, 540 ft long, built by American Gas and Electric Co on New River near Radford, Va, featuring elaborate grouting and foundation consolidation and sand-asphalt cutoff; geology of site; concreting procedure; joints in concrete; provision for flood flows. (See also - editorial comment p 390)
Design and construction features of Claytor hydro development
Eng News-Rec
Sporn, P. (author) / Kammer, H.A. (author)
1941
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Asphalt cutoff wall at Claytor dam
Engineering Index Backfile | 1942
|Construction features of Osage hydro-electric development
Engineering Index Backfile | 1931
|Construction features of Osage hydro-electric development
Engineering Index Backfile | 1931
|Construction of the Bennett hydro development
Springer Verlag | 1974
|Construction of the Zeya hydro development
Online Contents | 1973
|