A platform for research: civil engineering, architecture and urbanism
Toronto breakwater to curb 10-foot waves
Heavy concrete blocks molded separately to be set in walls by cranes and capped with mass concrete, as part of $19,000,000 waterfront improvement. (1000 w.) (No. 57505)
Toronto breakwater to curb 10-foot waves
Heavy concrete blocks molded separately to be set in walls by cranes and capped with mass concrete, as part of $19,000,000 waterfront improvement. (1000 w.) (No. 57505)
Toronto breakwater to curb 10-foot waves
Eng Rec
1914
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rapid progress on Toronto breakwater
Engineering Index Backfile | 1923
Breakwater construction, Toronto island shore
Engineering Index Backfile | 1923
|Making concrete blocks for Toronto breakwater
Engineering Index Backfile | 1919
|OBLIQUE IRREGULAR WAVES LOAD ON SEMICIRCULAR BREAKWATER
Online Contents | 2005
|Diffraction of Waves by Semi-Infinite Breakwater
ASCE | 2021
|