A platform for research: civil engineering, architecture and urbanism
Pouring of 55 ft high concrete wall and cantilevering 27 ft of concrete deck around 5600 ft of ancient pier at Boston U S Army base; specially designed prefabricated steel wall forms; preparing harbor bed; first poured walls used as bulkhead forms for alternate pours; concreting; joining wall sections. (p 136-137, 140, 141, 144)
Pouring of 55 ft high concrete wall and cantilevering 27 ft of concrete deck around 5600 ft of ancient pier at Boston U S Army base; specially designed prefabricated steel wall forms; preparing harbor bed; first poured walls used as bulkhead forms for alternate pours; concreting; joining wall sections. (p 136-137, 140, 141, 144)
110-ton steel forms speed pier repairs
Construction Methods Equipment
Boracci, A. (author)
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|British Library Conference Proceedings | 1998
|Windsor Bridge Pier Repairs Phillip Pierce and
Online Contents | 1996
|Repairs to Richard E. Knight Bulk Pier, Tampa Port Authority
British Library Conference Proceedings | 1995
|