Kariba hydro-electric scheme on Zambesi river
Contracts placed for construction of first stage of scheme to be built in Federation of Rhodesia and Nyasaland; main elements of scheme; capacity 1200 mw; max height 405 ft; net power station head 300 ft; there will eventually be six turboalternator sets each of 100 mw capacity with Francis turbines; river works for constructing dam.
Kariba hydro-electric scheme on Zambesi river
Contracts placed for construction of first stage of scheme to be built in Federation of Rhodesia and Nyasaland; main elements of scheme; capacity 1200 mw; max height 405 ft; net power station head 300 ft; there will eventually be six turboalternator sets each of 100 mw capacity with Francis turbines; river works for constructing dam.
Kariba hydro-electric scheme on Zambesi river
Engineer
Engineer ; 202
1956
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1960
Engineering Index Backfile | 1958
|Some aspects relating to civil engineering construction of Kariba hydro-electric scheme
Engineering Index Backfile | 1961
|Zambezi hydro-electric development at Kariba, first stage
Engineering Index Backfile | 1960