A platform for research: civil engineering, architecture and urbanism
Progress of east coast main line widening
Earthworks and tunneling operations on 2 1/2 mi double track section on Eastern Region, British Railways; scheme involves duplication of three double line tunnels, 384 yd, 232 yd, and 1214 yd long; second is completed, while about three fourths of latter has been cut and lined in precast concrete units with dry joints. (See also Ry Gaz v 108 n 7 Feb 14 1958 p 186-7 Engineer v 205 n 5325 Feb 14 1958 p 254-5)
Progress of east coast main line widening
Earthworks and tunneling operations on 2 1/2 mi double track section on Eastern Region, British Railways; scheme involves duplication of three double line tunnels, 384 yd, 232 yd, and 1214 yd long; second is completed, while about three fourths of latter has been cut and lined in precast concrete units with dry joints. (See also Ry Gaz v 108 n 7 Feb 14 1958 p 186-7 Engineer v 205 n 5325 Feb 14 1958 p 254-5)
Progress of east coast main line widening
Engineering
Engineering ; 185
1958
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Progress of east coast main line widening
Engineering Index Backfile | 1958
Progress of east coast main line widening
Engineering Index Backfile | 1958
£ 2m. East Coast main line widening scheme in progress
Engineering Index Backfile | 1957
£ 2m. East Coast main line widening scheme in progress
Engineering Index Backfile | 1957
£ 2m. East Coast main line widening scheme in progress
Engineering Index Backfile | 1957