A platform for research: civil engineering, architecture and urbanism
£ 2m. East Coast main line widening scheme in progress
Tunneling operations at Potters Bar; dry concrete segment lining used for first time in Great Britain; driving of three new twin track tunnels; widening of existing cuts on down side of line. (see also Engineer v 203 n 5282 Apr 19 1957 p 612-3; Civ Eng (Lond) v 52 n 612 June 1957 p 675-7)
£ 2m. East Coast main line widening scheme in progress
Tunneling operations at Potters Bar; dry concrete segment lining used for first time in Great Britain; driving of three new twin track tunnels; widening of existing cuts on down side of line. (see also Engineer v 203 n 5282 Apr 19 1957 p 612-3; Civ Eng (Lond) v 52 n 612 June 1957 p 675-7)
£ 2m. East Coast main line widening scheme in progress
Surveyor
Surveyor ; 116
1957
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
£ 2m. East Coast main line widening scheme in progress
Engineering Index Backfile | 1957
£ 2m. East Coast main line widening scheme in progress
Engineering Index Backfile | 1957
Progress of east coast main line widening
Engineering Index Backfile | 1958
Progress of east coast main line widening
Engineering Index Backfile | 1958
Progress of east coast main line widening
Engineering Index Backfile | 1958