A platform for research: civil engineering, architecture and urbanism
Progress of east coast main line widening
Earthworks and tunneling operations on 2 1/2 mi double track section on Eastern Region, British Railways; scheme involves duplication of three double line tunnels, 384 yd, 232 yd, and 1214 yd long; second is completed, while about three fourths of latter has been cut and lined in precast concrete units with dry joints. (see also Engineering v 185 n 4798 Feb 21 1958 p 248-9; Engineer v 205 n 5325 Feb 14 1958 p 254-5.)
Progress of east coast main line widening
Earthworks and tunneling operations on 2 1/2 mi double track section on Eastern Region, British Railways; scheme involves duplication of three double line tunnels, 384 yd, 232 yd, and 1214 yd long; second is completed, while about three fourths of latter has been cut and lined in precast concrete units with dry joints. (see also Engineering v 185 n 4798 Feb 21 1958 p 248-9; Engineer v 205 n 5325 Feb 14 1958 p 254-5.)
Progress of east coast main line widening
Ry Gaz
Railway Gazette ; 108
1958
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Progress of east coast main line widening
Engineering Index Backfile | 1958
Progress of east coast main line widening
Engineering Index Backfile | 1958
£ 2m. East Coast main line widening scheme in progress
Engineering Index Backfile | 1957
£ 2m. East Coast main line widening scheme in progress
Engineering Index Backfile | 1957
£ 2m. East Coast main line widening scheme in progress
Engineering Index Backfile | 1957