A platform for research: civil engineering, architecture and urbanism
Stabilization by drainage of Muck and Sand Fill
Construction of 4000 ft of Mount Vernon Memorial Highway in crossing area on Columbia Island built up from waste material resulting from hydraulic dredging; analysis of soils; stabilization involving reduction of moisture content and addition of material to fill; compression test data; plan of drainage of Columbia Island.
Stabilization by drainage of Muck and Sand Fill
Construction of 4000 ft of Mount Vernon Memorial Highway in crossing area on Columbia Island built up from waste material resulting from hydraulic dredging; analysis of soils; stabilization involving reduction of moisture content and addition of material to fill; compression test data; plan of drainage of Columbia Island.
Stabilization by drainage of Muck and Sand Fill
Pub Roads
Hogentogler, C.A. (author) / Willis, E.A. (author)
Public Roads ; 13
1932
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Muck dredged out, solid fill pumped
Engineering Index Backfile | 1941
|Ash fill on muck base makes airport
Engineering Index Backfile | 1938
Ash fill on muck base makes airport
Engineering Index Backfile | 1938
European Patent Office | 2020
|Drainage effects of gyttja-muck soil
British Library Conference Proceedings | 1993
|