A platform for research: civil engineering, architecture and urbanism
Report on construction of road across marsh lands of Beaufort County, South Carolina, where 20 to 30 ft of unstable mucky material had to be dredged out before road fill could be built to elevation of 8 1/2 ft above marsh; surveying problems; probing through marsh to locate elevation of sand bottom; procedures during construction; handling shovel waste; pumping around piling; efficiency of flat slopes.
Report on construction of road across marsh lands of Beaufort County, South Carolina, where 20 to 30 ft of unstable mucky material had to be dredged out before road fill could be built to elevation of 8 1/2 ft above marsh; surveying problems; probing through marsh to locate elevation of sand bottom; procedures during construction; handling shovel waste; pumping around piling; efficiency of flat slopes.
Muck dredged out, solid fill pumped
Roads Streets
Wilson, T.E. (author)
Roads and Streets ; 84
1941
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ash fill on muck base makes airport
Engineering Index Backfile | 1938
Ash fill on muck base makes airport
Engineering Index Backfile | 1938
Stabilization by drainage of Muck and Sand Fill
Engineering Index Backfile | 1932
|Difficult work on highway fill in muck-bottom lake
Engineering Index Backfile | 1930
Speeding settlement of fill over muck by use of explosives
Engineering Index Backfile | 1931