A platform for research: civil engineering, architecture and urbanism
Ash fill on muck base makes airport
Construction of largest U S airfield at North Beach, New York City, at cost of $25,000,000; 12,000,000 cu yd of old rubbish hauled by truck from Riker's Island over temporary trestle and dumped into shallow water on top of 70 ft of soft muck; grading and filling operations involving 15,000,000 yd of excavation; job organization; temporary highway bridge. (See also - discussion n 23 June 1938 p 803)
Ash fill on muck base makes airport
Construction of largest U S airfield at North Beach, New York City, at cost of $25,000,000; 12,000,000 cu yd of old rubbish hauled by truck from Riker's Island over temporary trestle and dumped into shallow water on top of 70 ft of soft muck; grading and filling operations involving 15,000,000 yd of excavation; job organization; temporary highway bridge. (See also - discussion n 23 June 1938 p 803)
Ash fill on muck base makes airport
Eng News-Rec
Engineering News-Record ; 120
1938
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ash fill on muck base makes airport
Engineering Index Backfile | 1938
Muck dredged out, solid fill pumped
Engineering Index Backfile | 1941
|Stabilization by drainage of Muck and Sand Fill
Engineering Index Backfile | 1932
|Difficult work on highway fill in muck-bottom lake
Engineering Index Backfile | 1930
Speeding settlement of fill over muck by use of explosives
Engineering Index Backfile | 1931