A platform for research: civil engineering, architecture and urbanism
Jetty works of ford motor company at Dagenham
Construction of jetty in Thames River, 1515 ft long, supported on series of hollow reinforced-concrete piers, 6 ft and 7 ft in diam, spaced at intervals of 24 ft along length of jetty and 40 ft apart transversely; detail of spring feeder; cylinder sinking; formwork and concreting; test loading; dredging and silting.
Jetty works of ford motor company at Dagenham
Construction of jetty in Thames River, 1515 ft long, supported on series of hollow reinforced-concrete piers, 6 ft and 7 ft in diam, spaced at intervals of 24 ft along length of jetty and 40 ft apart transversely; detail of spring feeder; cylinder sinking; formwork and concreting; test loading; dredging and silting.
Jetty works of ford motor company at Dagenham
Instn Civ Engrs -- Proc
Deane, H.J. (author)
1932
18 pages
1 Supp Plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Jetty works of ford motor company at Dagenham
Engineering Index Backfile | 1933
|Power-house foundations and circulating-water tunnels at Ford Motor Company's Works, Dagenham
Engineering Index Backfile | 1933
|Design and construction of new assembly building for Ford Motor Company Limited, Dagenham
Engineering Index Backfile | 1960
|Power-house foundations and circulating-water tunnels at Ford Motor Company's works, Dagenham
Engineering Index Backfile | 1933
|Power-house foundations and circulating-water tunnels at Ford Motor Company's Works, Dagenham
Engineering Index Backfile | 1933
|