A platform for research: civil engineering, architecture and urbanism
Design and construction of new assembly building for Ford Motor Company Limited, Dagenham
New building is 1215 ft long, 630 ft wide; description of site and soil exploration, site leveling and drainage, piling, foundations and ground floor slab, concrete and steel frame construction of ground floor and superstructure, wood-wool roof paneling, conveyor bridge, fire protection, ancillary buildings, and water treatment plant.
Design and construction of new assembly building for Ford Motor Company Limited, Dagenham
New building is 1215 ft long, 630 ft wide; description of site and soil exploration, site leveling and drainage, piling, foundations and ground floor slab, concrete and steel frame construction of ground floor and superstructure, wood-wool roof paneling, conveyor bridge, fire protection, ancillary buildings, and water treatment plant.
Design and construction of new assembly building for Ford Motor Company Limited, Dagenham
Structural Engr
Lax, D. (author) / Bunclark, F.T. (author)
Structural Engineer ; 38
1960
19 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Jetty works of ford motor company at Dagenham
Engineering Index Backfile | 1933
|Jetty works of ford motor company at Dagenham
Engineering Index Backfile | 1932
|Power-house foundations and circulating-water tunnels at Ford Motor Company's Works, Dagenham
Engineering Index Backfile | 1933
|Power-house foundations and circulating-water tunnels at Ford Motor Company's works, Dagenham
Engineering Index Backfile | 1933
|Power-house foundations and circulating-water tunnels at Ford Motor Company's Works, Dagenham
Engineering Index Backfile | 1933
|